In the high-velocity hurricane zone a roof is a structural assembly, not a covering. Every component — deck, fastening pattern, underlayment, flashing, tile attachment — carries a product approval number, and the inspector checks the numbers against what is actually on the roof.
We install complete, approved systems and we photograph every stage: deck nailing, secondary water barrier, flashing terminations, and the finished field. That record is what your insurer and the next buyer's inspector will ask for, and it is what turns a wind-mitigation form into a premium discount.
What is included
- Concrete and clay tile roof systems
- Architectural shingle re-roofs
- Standing-seam and 5V-crimp metal roofing
- Modified bitumen and TPO flat-roof systems
- Secondary water barrier and deck re-nailing
- Skylight, chimney and parapet flashing
- Balcony, terrace and planter waterproofing
- Wind mitigation documentation for insurance
Project details
| Typical duration | 3–10 days for a residential re-roof |
|---|---|
| Systems | Tile, shingle, metal, modified bitumen, TPO |
| Wind rating | Assemblies approved for HVHZ design pressures |
| Warranty | 10–25 year manufacturer system warranty, 5 years workmanship |
| Service area | Miami-Dade and Broward County |


