Electrical is the trade where deferred maintenance is least visible and most expensive. A 1970s 100-amp service with a discontinued panel will run a house right up until the day it cannot, and by then the insurer, the buyer or the inspector has already made it your problem.
We design and install electrical systems around real, measured demand: air conditioning, induction cooking, tankless water heating, pool equipment, back-up power and vehicle charging. Everything is permitted, inspected and labelled — panel schedules included — so the next electrician who opens that cover knows exactly what they are looking at.
What is included
- Service and panel upgrades (150A / 200A / 400A)
- Whole-house and partial rewiring
- Recessed, architectural and landscape lighting
- EV charger circuits (Level 2, 40–60A)
- Generator interlocks and transfer switches
- Surge protection and grounding upgrades
- AFCI / GFCI code corrections and insurance repairs
- Recertification electrical corrections for commercial buildings
Project details
| Typical duration | 1 day for a circuit; 2–5 days for a service upgrade |
|---|---|
| Common upgrades | 100A → 200A service, generator interlock, EV charger |
| Permits | Electrical trade permit and utility coordination included |
| Warranty | 2 years on workmanship |
| Service area | Miami-Dade and Broward County |


