Clients rarely judge a project by the strength of its tie beam. They judge it by whether the tile lines up at the door, whether the cabinet reveals are even, and whether the paint looks right in raking afternoon light.
We keep interior finishing under our own supervision with a single crew responsible for the whole package — level-5 drywall where it is warranted, tile set with the layout drawn before the first sheet is opened, and millwork shop-drawn and dry-fitted before finishing.
What is included
- Drywall hanging, finishing and level-5 skim
- Large-format tile, natural stone and mosaic
- Custom kitchen, bath and closet cabinetry
- Trim, crown, baseboards and coffered ceilings
- Interior doors and architectural hardware
- Wall panelling, feature walls and slat systems
- Interior and exterior painting, elastomeric coatings
- Countertop templating and installation
Project details
| Typical duration | 2–8 weeks depending on the scope |
|---|---|
| Millwork | Custom shop-built, plywood box construction, soft-close hardware |
| Tile | Large-format up to 48", uncoupling membranes, waterproofed wet areas |
| Warranty | 2 years on workmanship |
| Service area | Miami-Dade and Broward County |


